Jeremy's visual confirmation of peak saturation — he waters until about a quarter inch of runoff appears under the container, meaning the soil column is fully charged with water.
He uses runoff quantity as a diagnostic on the stressed Los Oli plant rather than a meter.
Discussed in: Ep 012